This project involved the complete redesign of the 3510 m² hall DSM for Karimpol Group in Senec. The main goal was to provide better illumination in the interior of the warehouse. The performance of the existing lamps was insufficient, having a short operating life and high energy consumption.
Karimpol Group has developed industrial, office, and commercial projects totaling 250,000 m² in Slovakia, the Czech Republic, Poland, the Netherlands, Luxembourg and Austria.
The customer’s special request was to work with the following parameters: 200 lx inside the warehouse and in the manufacturing area due to the need for better visibility.
The original 450W metalhalogenid lamps in total of 53 luminaires were fully replaced with 45W and 180W DDK-LED Modular system. The energy costs after the installation of LED luminaires dropped by 56%. The expected return on investment of the project is 2.5 years